Lake Project 5-8

 

Phase 2 was to re-deck an existing dock with composite materials.
Lake Project 5 Lake Project 6 Lake Project 7 Lake Project 8

5.) A closer look at weathered decking.
6.) The box contains a pump for lawn watering; it was also intended as a seat to sit by the lake, but its previous condition made sitting unsafe.
7.) Shows new composite decking and newly constructed box/seat also of composite material.
8.) Details of pump box.

Lake Project 1-4

This project was in two phases.  The first was to construct a revetment of treated beams and rip-rap to check erosion along lake front.  After surveying, construction began on the revetment.
Lake Project 1 Lake Project 2 Lake Project 3 Lake Project 4

1.) This photo shows the extent of erosion.
2.) Construction is well underway to protect this property.
3.) Revetment is complete.
4.) Dock is an eyesore compared to the new coastline.