Lake Project 1-4

This project was in two phases.  The first was to construct a revetment of treated beams and rip-rap to check erosion along lake front.  After surveying, construction began on the revetment.
Lake Project 1 Lake Project 2 Lake Project 3 Lake Project 4

1.) This photo shows the extent of erosion.
2.) Construction is well underway to protect this property.
3.) Revetment is complete.
4.) Dock is an eyesore compared to the new coastline.

Lake Project 5-8

 

Phase 2 was to re-deck an existing dock with composite materials.
Lake Project 5 Lake Project 6 Lake Project 7 Lake Project 8

5.) A closer look at weathered decking.
6.) The box contains a pump for lawn watering; it was also intended as a seat to sit by the lake, but its previous condition made sitting unsafe.
7.) Shows new composite decking and newly constructed box/seat also of composite material.
8.) Details of pump box.

Partitioning a Room

Wall Partitions Sheetrock
In this old house, the front door (out of view, to the left in the first picture and to the right in the second) entered into a large parlor.  The owners wanted a wall constructed to define a sitting room off the entry hall.  We had to match the 60 year old crown and base moldings in both new rooms.  Ask us how we did it.